00. home   |   bosanski
     01. about us
     02. scope of work
     03. target industries
     04. production capacities
     05. references
     06. products
     07. partners
     08. downloads
     09. contact info
 

 

BUILDINGS

production building with 3,600 m2 area, 11 m height and 1.200 m2 office area with complete infrastructure included. Located at attractive industry district in Sarajevo (Energoinvest - Stup), between highway, railway and airport.

Headquarters building with 500 m office area and 600 m2 of surrounding landscape.

warehouse with 1.800 m2 stocking area and complete
infrastructure included.

 

 

 

EQUIPMENT

plasma cutting, up to 10 mm steel sheets, programmable

gas cutting, dual head, up to 300 mm steel, 2000x6000 mm steel sheets

welding machines, TIG/WIG, REL, MAG/MIG

grinding machines

drilling machines

band saws, up to 500 mm steel blocks

circular cutting machines

bending machines

auto-crane cap. 80 t, 65 m telescope

vehicles

console cranes, 10 t capacity with 20 m range

hydraulic press 150 t

eccentric press 80 t

punch/cutting machine (hole up to dia 90 / 25 mm thickness, profiles and bands up to 140 mm, steel bars up to dia 50 mm.

 


[ Tvornička 3, 71000 Sarajevo - Bosna i Hercegovina - info@energoinvest-tmp.com - phone. + 387 33 767 125 ]